Apartment Reconstruction

Apartment Reconstruction

Small Apartment In Belgrade

Redesign & Reconstruction

Project details
—————–

Floor Area: 41m²
Starting Date:
January 2019
Design And Renovation Time: 8 weeks

Reconstruction of an apartment that was in very poor condition. The first phase of the project was a detailed analysis and drafting of the existing situation. The second phase was the development of a detailed reconstruction project. The third phase was the organization of construction works in accordance with the project.

Apartment before the renovation
————

Apartment after the renovation
————

The Challange

Matching the client’s wishes with the real situation on the ground was the biggest challenge in this project. Another challenge was the difficult accessibility of the site for the delivery of construction materials and the removal of demolished elements.

Get In Touch

Phone

+381 64 27 44 151

Email

My Location

New Belgrade, Serbia

3 + 1 =

Daylight House

Daylight House

Sunlight House

Architectural Design

Project details
—————–

Floor Area: 131m²
Starting Date:
January 2020
Architectural Project & Solution: 6 weeks
Software Used: Autodesk AutoCAD, 3DS Max, Adobe Photoshop

Residential house made in a combination of wood and concrete.
Positioned undisturbed by the environment and engineered to take full advantage of natural light throughout the day.

Architectural Project and solution
————

The Challange

The position of the house is on a hill, so it is required that all rooms be exposed to sunlight at all times. The solution was achieved with an open plan of the house and good interconnection of all rooms.

Get In Touch

Phone

+381 64 27 44 151

Email

My Location

New Belgrade, Serbia

3 + 1 =

Sports Center

Sports Center

Sports Center – Vlasina Lake

Architectural Design

Project details
—————–

Floor Area: 980m²
Starting Date:
July 2021
Architectural Project & Solution: 11 weeks
Software Used: Autodesk AutoCAD, 3DS Max, Adobe Photoshop

Sports Center located on one of the most beautiful parts of Serbia, on the Vlasina Plateau at an altitude of 1200m.
Surrounded by nature, mountains and a lake, it is an ideal location for vacations, rest and the preparation of the athletes.

Architectural Project and solution
————

The Challange

The Sports Center is located on a natural hill above the lake. In order to protect the building from a potential landslide, care had to be taken to provide the terrain with retaining walls. Due to the strong winds in the winter that blow from the direction of the lake, one of the challenges was to design the building so that the part in front is protected from the influence of the wind. Due to the exceptional position of the building, it was necessary to provide a view of the lake from all rooms.

Get In Touch

Phone

+381 64 27 44 151

Email

My Location

New Belgrade, Serbia

15 + 14 =

Holiday House

Holiday House

Holiday House – Fruska Gora

Architectural Design

Project details
—————–

Floor Area: 280m²
Starting Date:
January 2021
Architectural Project & Solution: 12 weeks
Software Used: Autodesk AutoCAD, 3DS Max, Adobe Photoshop

Holiday and residential house, located in a deep forest on the slopes of Fruska Gora in complete peace. It is made in a combination of concrete and wood materials to fit into the environment in which it is located.

Architectural Project and solution
————

The Challange

The client’s desire to build a house in the deep forest led to more challenges. The biggest is how to design the access road to the location where the house will be built.