Project details
—————–
Floor Area: 41m²
Starting Date: January 2019
Design And Renovation Time: 8 weeks
Reconstruction of an apartment that was in very poor condition. The first phase of the project was a detailed analysis and drafting of the existing situation. The second phase was the development of a detailed reconstruction project. The third phase was the organization of construction works in accordance with the project.
Apartment before the renovation
————
Apartment after the renovation
————
The Challange
Matching the client’s wishes with the real situation on the ground was the biggest challenge in this project. Another challenge was the difficult accessibility of the site for the delivery of construction materials and the removal of demolished elements.
Related Projects
Get In Touch
Phone
+381 64 27 44 151
My Location
New Belgrade, Serbia